Abstract

A control chart, being an important tool of statistical process control, has been used for process monitoring and detection of any out-of-control process situation. In this paper, the Shewhart [Formula: see text] chart, also known as the traditional control chart, in combination with the process capability index [Formula: see text] proposed by Subramani and Balamurali, is presented under the repetitive sampling scheme. The optimal design parameters of the proposed control chart are calculated. The performance of the proposed control chart is evaluated through the average run lengths (ARLs). Numerical tables have been constructed for the purpose of comparing the in-control ARL and the out-of-control ARL with the single sampling scheme. The findings of the study show that the newly suggested sampling scheme is better than the existing single sampling scheme in detection of mean shift of the process.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.