Abstract

PT XYZ is a State-Owned Enterprise that produces military equipment. Due to an increasing demand for such equipment every year, ammunition box sub-department asked their workers to work overtime and the total cycle time of ammunition box lid is higher than that of the ammunition box. Heuristic approaches, namely the Birnie Helgeson (RPW) and Moodie Young, are used to overcome these issues. This study aims to improve line balancing efficiency of ammunition box production. The findings showed that the Moodie Young method resulted in a 7.98% increase in line efficiency of the ammunition box lid and 21.77% increase in that of the ammunition box. In addition, the balance delay value decreased as much as the line efficiency. There are 9.09 and 152.87 decrease in the smoothing index of the ammunition box lid and the ammunition box. The Moodie Young method cut the total labor cost to 9,597,170 rupiahs.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.