Abstract

Wendelstein 7-X (W7-X) is a fully optimized low-shear stellarator and shall demonstrate the reactor potential of this fusion plant. It is presently under construction at the Greifswald Branch Institute of IPP. The superconducting magnet system will allow continuous operation, limited only by the plasma exhaust system whose capacity is designed for 30 min full power operation. The Wendelstein 7-X (W7-X) coils and structures are part of the largest superconducting fusion device being constructed at present. They represent a technical challenge at industrial level and the need for proven techniques and manufacturing processes in accordance to the highest quality standards. The production of these components requires a management of monitoring for quality and tests. The coil system consists of 20 planar and 50 non-planar coils. They are supported by a pentagonal 10 m diameter, 2.5 m high coil support structure (CSS). The CSS is divided into five modules. Each module consists of two equal half modules. The manufacturing status of the CSS and the main project management and technical challenges will be presented. The lessons learned in the large scale production of this difficult kind of support structure will be presented as relevant experience for the realization of similar systems for future fusion devices, such as ITER.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.