Abstract

AbstractThe construction joint venture NouvLR is constructing the new light rail network in Montreal. One of the major challenges is the advance below the existing runways and taxiways of the Montreal‐Trudeau International airport and the construction of the subway station below the airport. The airport must remain under operation during the construction, and very tight requirements have been imposed regarding the tolerable surface settlements and availability of the monitoring data. The regulations regarding operations of the airport and possible presence of foreign objects in vicinity of its runways and taxiways represent an additional challenge, requiring usage of less straightforward monitoring concepts. The works for the installation of the monitoring equipment must be closely coordinated with airport operations and require a reliable schedule.The final geotechnical monitoring design has been performed in close cooperation with the contractor and in tight coordination with the airport authority. In order to allow more straightforward communication, 3D modelling and BIM‐methodology have been used to clearly represent the monitoring equipment, as well as the works required for their installation. The line‐of‐sight considerations in case of tachymeter measurements have been thus directly incorporated and dealt with. The monitoring design has to fulfil the aims of real‐time monitoring of the system behaviour during the construction and the long‐term monitoring of the newly built tunnel, demonstrating the compliance of the structure with the design. The paper is concluded by a summary of ”lessons learned“ regarding the issues of adverse accessibility and a challenging, high risk general environment.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call