Abstract

The difficulties discovered in selecting subcontractors via a simple method of bid price as the main factor along with an initial screening of subcontractor properties impressed us to look at a little beyond the existing trend and offer a coherent procedure for this purpose. Despite this, we know that the main factor in outsourcing a project is a bid price and this is in full agreement with the existing circumstances of subcontractor selection in Iran, but the objective of this research was integrating all criteria with the same importance for selecting a subcontractor. The questionnaire was used for collecting initial data of research to pass through the Analytic Hierarchy Process (AHP) and Multi-Criteria Decision-Making (MCDM) model of Simple Additive Weighting (SAW). The findings showed the priority in subcontractors' selection as Hejrat Manesh Izeh (1), Khesht Sazan Karoun (2), Yeganeh saze omid (3), Sakht karan Moongasht (4), Darya Sanat Khavarmianeh (5), Omran mehragane Yosef (6) respectively. The present study offered a coherent procedure to select the subcontractor regardless of the bid price importance and integrating all interfering criteria in the same importance.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.