Abstract
To enable neutron time-of-flight (TOF) experiments at the RAON heavy-ion accelerator facility, we propose a single bunch beam selection method by combining a fast chopper and double gap buncher in the low-energy beam transport (LEBT) section. The fast chopper operates with switching times of tens of ns to convert a CW beam into a pulsed beam.Then, the double gap buncher performs bunching to shorten the beam pulse duration to less than one radio frequency quadrupole (RFQ) cycle.Ideally, a single isolated bunch can be achieved after the RFQ.In this study, we discuss the system design of the proposed single bunch selection scheme and present detailed beam dynamics simulations.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.