Abstract

Requirement and technical issues of the neutral beam (NB) system are discussed for a fusion DEMO plant. The NB system for DEMO should be characterized by high efficiency, high energy, high reliability in year-long steady operation, and low maintenance frequency. From the viewpoint of high efficiency, use of conventional electrostatic accelerator is realistic. Due to operation under radiation environment, vacuum insulation is essential in the accelerator. According to the insulation design guideline, it was clarified that a beam energy of 1.5–2 MeV is possible in the accelerator. Development of filamentless, and cesium free ion source is required to achieve low maintenance frequency, based on the existing high current/high current density negative ion production technology. The gas neutralization is not applicable due to its low efficiency (60%). R&D on an advanced neutralization scheme such as plasma neutralization (efficiency: >80%) is required. Recently, development of cw high power semiconductor laser is in progress. The paper shows a conceptual design of a high efficiency laser neutralizer utilizing the new semiconductor laser array.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.