Abstract

The pollution problem arising from the flushing of initial rainwater and wastewater from accidents while transporting dangerous goods to source water protection areas needs to be solved as soon as possible. Therefore, the design of corresponding environmental protection measures should be considered in the engineering design stage. It is necessary to analyze the specific work in combination with engineering examples. Under this background, this paper first briefly expounds the precautions in accident risk analysis and the design of tank capacity and tank body. Finally, by analyzing actual cases, this paper systematically studies the design strategy of emergency pool in source water protection area, hoping to provide new development ideas for the upgrading of relevant work.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.