Abstract

Current formulas to assess the shear capacity of headed steel stud anchors and post-installed (PI) anchors in case of pryout failure (sometimes known as pull-rear failure) have been derived either based on the indirect-tension resistance model or are fully empirical based on push-out test results. In both cases, the predicted pryout capacity is clearly conservative and underestimates the true pryout capacity of anchorages, especially for stiff anchors with low embedment-to-diameter ratios (hef/d < 4.5). This paper proposes an empirical and a semi-empirical formula to predict the concrete pryout capacity of headed steel studs and PI anchors. They were derived based on an improved indirect-tension model which accounts for the stud diameter and the stud spacing in a group of anchors. Furthermore, a database of 214 monotonic shear tests from the literature, including own tests (push-off and horizontally shear tests), is reevaluated and compared to the provisions of EN1992-4. The scope of this assessment proposal includes single and group of headed steel studs and PI anchors attached to a stiff steel plate as well as shear connectors in composite structures without metal deck embedded in normal-weight concrete.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.