Abstract

Abstract This paper presents a new method for design of water-using networks with two internal water mains. A conventional water-using network without internal water mains is obtained first by using the concentration potential method. The processes are divided into three parts to form an initial structure of the water-using network with two internal water mains, based on the features of the conventional water-using network obtained. The final design can be obtained in a few iterations by adjusting the amounts of the internal water mains. The results of a few literature examples show that the designs obtained in this work are comparable to that obtained in the literature. The significance of the work presented is that all the design steps, including the formation and adjustment of the internal water mains, are orientated with clear engineering meanings, which are expressed by the values of concentration potentials.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.