Abstract

Abstract: In order to meet the water demand of the continuously growing population of Bisur village and failure of current water supply system it is essential to provide the sufficient and uniform quantity of water through the design of various units of water treatment plant, so for design work we have collected information of proposed area like Main water source, Population, Demand of water, quality of water, distribution network and water tanks etc. from MJP (Maharashtra Jeevan Prabhakaran) and local authorities. After analysed above data we calculated (i) Future population (ii) Water characteristics (iii)Design Period (iv)Water demand [101 LPCD]. After conducting and analysis of survey data we proposed an efficient new alignment for water distribution system and we designed various units of water treatment plant like Aeration, Alum Tank, Tube settler, Rapid Gravity filter, rising main, Jack Well, Sump etc. This proposed design of the water supply scheme for proper supply of water is sufficient to meet the daily requirement of water in selected area. Keywords: RRWS, ESR, Water Demand, MJP, WTP, Population

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call