Abstract

The International Thermonuclear Experimental Reactor (ITER) superconducting magnet system requires current supplies from 10 kA to 68 kA. The components relating the electrical power and cryogens through the warm-cold barrier to the ITER magnets are the so-called feeders. In total there are 31 such feeders for the ITER magnet system, 9 of them necessary for the toroidal field magnet system are called TF feeders. Each feeder consists of three main units: the In-Cryostat Feeder (ICF), the Cryostat Feed-Through (CFT) and the S-Bend Box (SBB)/Coil Terminal Box (CTB) assembly. This paper presents the latest design of the TF feeder components.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.