Abstract

The design of the ion injection line connecting the electron beam ion source (EBIS) charge breeder and the Californium Rare Isotope Breeder Upgrade radio frequency quadrupole cooler-buncher at the Argonne Tandem Linear Accelerator System was investigated with particle tracking simulations. The injection line was configured to accommodate several differential pumping sections, individual optical components were optimized to minimize emittance growth, and the ion beam parameters were matched with the EBIS electron beam acceptance to minimize losses upon injection.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call