Abstract

Paks Nuclear Power Plant identified the post-Fukushima actions for mitigation and management of severe accidents caused by external events that include updating of some hazard assessments, evaluation of capacity / margins of existing severe accident management facilities, and construction of some mew systems and facilities. In all cases, the basic question was, what level of margin has to be ensured above design basis external hazard effects, and what level of or hazard has to be taken for the design. Paks Nuclear Power Plant developed certain an applicable in the practice concept for the qualification of already implemented and design the new post-Fukushima measures that is outlined in the paper. The concept and practice is presented on several examples.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.