Design of PV System for Mobile Tele-Communication Tower

Highlights

  • (4) Switch Mode Power Supply (SMPS): SMPS is the brain of the Mobile Tele-Communication tower

  • The steps for the SketchUp design criteria are as follows: 1) Check Placements and Dimensions given in Survey form and total acquired area from Survey form tower Placement, Gate, Diesel Generator (DG), ODC, entry gate of plot boundary and all dimensions

  • CONCLUSION a study was concluded for 5.25 kW and 10.5 kW off grid solar power plant for Mobile Tele-communication Tower

Read more

Summary

INTRODUCTION

The cost of energy is rising and solar energy is one of the most economical and exploitable renewable sources of energy that can be harnessed for generation of power. As we already know that the majority of Mobile Telecommunication Towers don’t have electricity connection from grid as they are located in remote locations throughout the country. They rely on Diesel generator, Batteries and Solar PV. Land acquired or Leased for each mobile Tower on an average is between 10x10 m and 15x15m and tower infrastructure space requirement is 5x5m and if there is an availability of additional space one may plan to install Solar PV if site conditions are suitable.

STRUCTURE AND DESCRIPTION OF SURVEY
Existing Working of Tele-Communication Tower and their Drawbacks
Different types of Solar PV Modules
BASIC CRITERIA FOR SKTCHUP DESIGN
PV watts Calculation
CONCLUSION