Abstract

This paper descriptionbes the method used at Agnes Gold Mine in the calculation of pillar strengths, which involves a back-analysis type of approach. The results obtained there are comparable with those obtained by accepted formulae for pillar strength. It was found that a stress level of 70 MPa for the width of combined pillars (Le. crown and sill pillars) causes failure of the reef drives as well as the tops and bottoms of the stope side walls. As shrinkage stoping to depths of more than 650 m would result in very Iow percentage extractions, alternative methods of stoping will have to be investigated for these depths.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call