Abstract

The drainage and sewage interception project hi Zhaoyang District involved the installation of a DN1000 municipal sewer pipeline with a total length of 1541 m. Considering factors such as geological conditions, pipe diameter, buried depth, groundwater level, as well as the impact of nearby underground and aboveground structures and traffic, the trenchless construction method of pipe jacking was selected for implementation. The pipeline followed the route of Weiba Road, crossed Jinying Avenue, and then proceeded along the Second Ring East Road until it reached the bank of Yaowan River. The project design took into account practical considerations, including the sewer pipe diameter, material selection, pipeline routing, construction of pipe jacking starting shafts, and the design and modification of arriving shafts, in line with the specific engineering requirements.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.