Abstract
In tunnel waterproofing construction, the method of laying geotextile and waterproof board is generally used. Because the geotextile material is relatively soft, and it is not easy to shape, which brings great inconvenience to the work of construction personnel. Through the analysis of the tunnel waterproofing construction process, based on the tunnel construction geotextile paving trolley, the software system of the trolley motion control system is designed. This system includes the controller program design and the man-machine interface design, and finally cooperates with the hardware system. Debugging verified the system function and the reliability of the equipment.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.