Abstract

This paper presents the study of a high performance 3-Phase 3.7kW 2-Pole line start permanent magnet synchronous motor for pumping system. A method was proposed to study the starting torque characteristics considering line start with high inertia load. A direct-quadrate model including cage was built to study the synchronization capability. Two-dimensional transient finite element analysis was utilized for accurate calculation of efficiency, starting current speed curve and etc. Structural analysis was also conducted to study the equivalent stress displacement of rotor at rated speed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.