Abstract

To realize the constant pressure water supply, a frequency converter is used to control the periodic duty of three pumps in this paper. Then, the communication between host computer and field control equipment is studied and realized by using industry Ethernet Graphical control interface, and remote monitoring is realized.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call