Abstract

Wastewater treatment plants (WWTP) are highly non-linear operations concerned with huge disturbances in flow rate and concentration of pollutants with uncertainties in the composition of influent wastewater. In this work, the activated sludge process model with seven reactor configuration in the ASM3bioP framework is used to achieve simultaneous removal of nitrogen and phosphorus. A total of 8 control approaches are designed and implemented in the advanced simulation framework for assessment of the performance. The performance of the WWTP (effluent quality index and global plant performance) and the operational costs are also evaluated to compare the control approaches. Additionally, this paper reports a comparison among proportional integral (PI) control, fuzzy logic control, and model-based predictive control (MPC) configurations framework. The simulation outcomes indicated that all three control approaches were able to enhance the performance of WWTP when compared with open loop operation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.