Abstract

Following part 1, this paper describes the development and real-time testing of an adaptive autoreclosing scheme for a 132-kV system with high penetration of wind generation. Having previously established the real-time system model, this second part concentrates on the hardware and software tools used to build the relay development platform, the algorithm itself, and the testing of this algorithm. A results section documents tests of the neural-network-based algorithm and is shown to be 100% reliable. Further successful tests on a 400-kV system suggest that the algorithm is robust to other system configurations.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.