Abstract
Nowadays, the penstock assembly welding of hydroelectric power stations is carried out by manual arc welding. In order to improve the working environment and raise the welding efficiency, this paper proposed a master-slave composite wall-climbing robot system based on gapped permanent magnet adhesion. With the master-slave composite design idea, the payloads of welding robot are shared and the flexibility and stability of the robot are improved. As a key mechanism of wall-climbing robot, the design and layout of the permanent magnetic adhesion module is studied. According to the result of static analysis and dynamic analysis of the welding robot, an optimized layout for adhesion module design is found. A Prototype of the robot system is built and experiments on the adhesion ability and motion ability of the robot system are carried out.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.