Abstract
A 10-MW, 91.4-GHz gyroklystron is under development for W-Band accelerator applications. The device is expected to generate 1-/spl mu/s pulses at up to 120 Hz, with efficiencies near 38%, with a gain above 57 dB. A double-anode, magnetron injection gun operating at 500 kV will provide a 55-Ampere beam for interaction with a six-cavity circuit in a magnetic field of about 27.9 kG. The beam will have an average perpendicular-to-parallel velocity ratio of approximately 1.6 with a parallel velocity spread below 3.3%. The first two cavities will operate in the TE/sub 011/ mode at the drive frequency near 45.7 GHz, while the remaining cavities will operate in the TE/sub 021/ mode at twice the drive frequency. The output cavity will have smooth radial wall transitions to minimize mode conversion and pulse heating, the latter of which is shown via thermal modeling to be within acceptable limits. The output signal will be in a TE/sub 01//TE/sub 02/ mode mixture for easier power handling and to facilitate possible depressed collector operation, which could result in wall plug efficiencies in excess of 50%. A complete description of the system design and modeling is presented.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.