Abstract

Gumu Township, Gaize County, Ali Prefecture, is a power free area, which has not yet covered the State Grid. It can only rely on solar energy, wind energy and other township level new energy power stations for power supply, which greatly restricts the development of local economy. This project aims at solving the power consumption problem of gumxiang primary school by adopting solar photovoltaic independent (off grid) power supply mode. According to the actual power consumption of gumu village primary school, a solar photovoltaic power station with a total installed capacity of 16.2kw is planned to be built.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call