Abstract

Evaluations performed on the New York State Electric and Gas Corporation's 115-kV Goudey-Oakdale line and Goudey and Oakdale substations to assess the capability of the existing equipment operate as part of a six-phase demonstration project are described. The design modifications that will be made to meet the goals of the commercial demonstration and to allow integration into the existing three phase operating grid are also described. Reconfiguration of an existing double-circuit line to a single-circuit six-phase line requires installation of phase configuration transformers at the end of the line terminals and the associated switching, metering, and protection equipment. In addition, the phase conductors from the terminals of the transformers must be transposed for connection to the transmission line to achieve the desired 60 degrees vectorial separation angle between adjacent phase conductors. Concepts of substation compaction that have been pursued when attempting substation modifications for six-phase reconfiguration are discussed.< <ETX xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">&gt;</ETX>

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.