Abstract

Phased construction and fast-tracking have received considerable attention in recent years and have been synonymous with the development of new project delivery systems under the professional construction management approach. Many articles and even textbooks have described only the advantages of these popular methods. Despite the differences between the two approaches, outlined in this paper, they are still being referred to interchangeably by construction professionals. Through a case study, this paper also identifies the potential disadvantages of the fast-track technique. Problem areas associated with the implementation of this technique are identified and further ranked with respect to their frequency observed on 28 fast-track construction contracts. A delay analysis shows the impact of this accelerated technique on construction activities. The far-reaching effects of mistakes during the early design/engineering phase in a fast-track programme are usually underrated. Accelerating a project through fas...

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.