Abstract
A distributed power supply system with highly efficient characteristics is being developed to replace conventional centralized power systems. In this system, as in conventional power systems, a standby energy system composed of batteries and engine-generator sets is used as a back-up system for the commercial power lines. However, the distributed power system, except for the engine-generator set, is installed in the telecommunications room. Thus, the floor load limitation is an important design factor. Reliability analyses show that the distributed power system should be designed using a fully duplicated engine-generator set; with battery reserve time reduced to one-sixth that of conventional centralized power systems; and with transfer switch unavailability designed to be less than 5*10/sup -7/. >
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.