Abstract
The PEP beam-transport system was designed to transmit 4-to-15 GeV electron and positron beams from the SLAC linac within a ± 0.8 percent momentum band, to have flexible tuning of the betatron and offmomentum functions for matching into the PEP storage ring, and to have convenient operating characteristics. The transport lines were brought into operation quickly and have operated well. Electron injection has been consistent and efficient and relatively easy to accomplish. Positron injection also has been satisfactory but is variable and more sensitive to ring conditions.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.