Abstract

ABSTRACT The semi-submersible has been adapted to perform numerous functions offshore unconnected with drilling but still operating as a mobile unit. When used as an early production unit however, it is required to remain on a particular site for several years. The strength and fatigue of one such unit is considered for three different locations in the North Sea. For completeness, several other typical design features have been incorporated into the structure. Existing and proposed fatigue criteria are investigated and the results discussed. The principal conclusion is that major structural modifications will be required if the proposed changes are implemented.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.