Abstract
Abstract An attempt to provide a design methodology for wastewater treatment in water hyacinth ponds Is tried in the following lines. Literature data is complemented with growth rate and yield measurements to develop a performance equation with two dimensioniess groups indicating the system capacity for nutrient removal. It is concluded that organic loads up to 10 Kg BOD Ha−1 d−1 are critical to obtain nitrogen removal efficencies greater than 80%. Nutrient removal can be increased if water hyacinth ponds are operated as maturation ponds.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.