Abstract

The proposed steel building at Mumbai consisting of G+10 storeys, has a built-up area of about 165m2. The typical floor height is 3m above GL and the total height of the building above GL is 33m.Withreference to given plan, the architectural drawings and structural drawings showing plan, elevation, sectional views and connection drawings are drawn by using AUTOCAD 2017.Design calculations (Dead Load, Live Load, Wind Load, Seismic Load) are calculated manually-As per IS codes which are mentioned in technical details. The rolled steel sections for beam and column has been chosen from IS 12778:2004. High tensile steel grade-E350BR has been used for steel sections. And, the analysis of structure is done by using STAAD.Pro V8i SS5.Design of beam and column are manually calculated-As per IS: 800-2007. And, spread sheet has been created to check the beam and column, whether it is safe or not. The connection designs are calculated-As per IS codes by using Welding-As per IS 9595-1996 and Fasteners-As per IS 3757-1985. Bracings are provided in the ground floor between the column to avoid soft storey failure. The material requirements are mentioned based on the design calculations. The total estimation of the building is 1.11cr.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call