Abstract

A simulation-based scheduling system is discussed which was developed for a semiconductor Backend facility. Apart from usual dispatching rules it uses heuristic search strategies for the optimisation of the operating sequences. In practice hereby multiple objectives have to be considered, e.g. concurrent minimisation of mean cycle time, maximisation of throughput and due date compliance. Because the simulation model is very complex and simulation time itself is not negligible, we emphasise to increase the convergence of heuristic optimisation methods, consequentially reducing the number of necessary iterations. Several realised strategies are presented.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.