Abstract

The Xiaolangdi Multipurpose Dam Project on the Yellow River near Luoyang, Henan Province of the People's Republic of China, involves design and excavation of 19 water conveyance tunnels, several access tunnels, a large number ofgrouting and drainage adits, and an underground powerhouse complex. This paper describes some aspects relating to the design of excavation and rock support of the tunnels, varying in diameter from 8 to 18.5 m, and the powerhouse complex. The rock consists of interbedded sandstone, siltstone and claystone. Close to very widely spaced beddingplanes dip at an angle of 8° to 10°, towards east.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.