Abstract
The testing required to approve a marine energy converters (MEC) device for full service is extensive and could take over a decade, as demonstrated by the Pelamis wave energy converter (WEC) device. However, lessons are being learned and progress to reliable devices is accelerating. It is still important, however, to implement effective testing programmes, and this chapter describes design and testing methods that can be used to drive up the reliability of future MEC devices. Ultimately, it is this that will determine the success of MEC devices in capturing and delivering wave and tidal energy in the long term.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.