Abstract
For the volume of the new prefabricated bridge with integral structure is huge and transportation and storage are difficult, scissors mechanism driven by hydraulic cylinder is presented to bridge design. Wth theoretical analysis, the position of the node, velocity and acceleration are analyzed. Using the ADAMS software, the whole model of deployable bridge section is established. The multi-body dynamic simulation of the whole model is studied. The simulation results are compared with those of theoretical analysis. The maximum error of them is 2.26%. The methods and conclusions are available for the design of developable bridge section.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.