Abstract

The current design of the ITER Toroidal Field coils and structures, the main critical design and manufacturing issues, and the status of the procurement arrangements for these components, which will be released to the ITER parties in early 2008 to start the manufacturing contracts, are described. Some qualification and R&D work still required in preparation for the manufacture are also mentioned.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.