Abstract
This paper investigates the performance of grid connected Solar PV system and presents simulation and sensitivity analysis of a 3MW grid-connected Photovoltaic (PV) system considering 25 years lifetime. This grid-connected system assumed to be built in the city of Medina located in the Kingdom of Saudi Arabia (KSA). The simulation is performed using Hybrid Optimization of Multiple Energy Resources (HOMER) software. Renewable energy resources, PV power production, and other key factors were investigated under sensitivity analysis. The research results showed that the system in the selected location has recorded a low LCOE with approximately $0.044 $/kWh and discounted payback period of around 17 years. Also, the results showed that this 3MW grid connected system can reduce the CO 2 emission by around 47%. However, the sensitivity analysis showed that there are several factors have a significant technical and economic impact on system.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.