Abstract

Based on the characteristics of high water pressure and large quantity water-inrush in water-rich dolomite formation around the 1000m level blind shaft of a mine in Yunnan province, pre-grouting was proposed to control water for safe and rapid tunneling. Three large chambers were set up as drilling platforms underground, and the pulping station was established on the surface, the red clay cement slurry was transported to underground grouting station through slurry pipeline. 496m long grouting section was designed and segmented downward manner was adopted. After pre-grouting, the water inflow in the pre-grouting section of the shaft is 7.86m3/h, which met the requirements of the national standard and the contracted maximum water inflow 10m3/h, excellent water control effect was obtained. scientific and reasonable pre-grouting design achieved safe and rapid tunneling of the 1000m level blind shaft.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.