Abstract

Design a special plug-in strip for on-site verification of electric energy meters, combined with a dedicated wiring backplane for non-stop meter replacement, to achieve non-stop meter replacement. On the basis of meeting the on-site verification work, design the special plug-in strip for verification, complete the selection of the materials of the special plug-in strip for verification, upgrade and improve the special plug strip for on-site verification of electric energy meters according to the requirements of safety, functionality, and durability. And open the mold trial production verification special plug-in sample. The special plug-in strip design for on-site verification of electric energy meters lays the foundation for realizing the replacement of electric meters without inductive power failure.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.