Abstract

In order to design a reasonable safe power control system and realize the automated management of offshore drilling system, this paper analyzes the electric system features and grid configuration of drilling platform; power station design and short circuit calculation; electrical power system electroplax selection. This system adopts oceanographic engineering software EDSA for construction and parameter input and conducts short-circuit calculation for modeling and simulation. The electric system design and short-circuit calculation can be examined by simulation result and real platform.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call