Abstract

Long pulse operation of high power ion source is the requirement of fusion science research on neutral beam injector. A breakdown of accelerator column is drastically increased when operating with high beam energy and long beam duration. To extend the pulse length, which was stopped with every breakdown so far, the beam re-starting technology was developed and utilized. As a result, the voltage drop of every power supply due to breakdown was recovered within a time of 90 ms and beam pulse length was extended much longer than the case before this improvement. The details of the beam re-starting technology and the preliminary results were presented in this manuscript.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call