Abstract
The C.S. “Long Lines” was designed both to lay the new SD submarine cable system and to repair new and existing undersea cables. Within the limits imposed by this dual purpose, an entirely new cable ship design has been evolved which gives maximum working efficiency, maneuverability, and stability. While most of the special features of the ship — wide-range power plant, cable storage and handling facilities, etc. — are the result of its special function, a great deal of attention has been paid to providing optimum working conditions for, and safety of, the ship's complement.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.