Abstract

An intense muon-neutrino beam (1017 Vmu/day) is generated at CERN and directed towards the Gran Sasso National Laboratory,LNGS, in Italy, 732 km from CERN. In the presently approved physics programme, it is foreseen to run the CNGS facility with 4.5 middot1019 protons per year for five years. During a nominal CNGS cycle, i.e. every 6s, two nominal SPS extractions of 2.4. 1013 protons each at 400GeV/c are sent down the proton beam line to the target. The CNGS secondary beam line, starting with the target, has to cope with this situation, which pushes the beam line equipment and instrumentation to the limits of radiation hardness and mechanical stresses during the CNGS operation. An overview of the CNGS secondary beam line is given. Emphasis is on the target, the magnetic focusing lenses (horn and reflector) and the muon monitors. The performance of the secondary beam line during beam commissioning and physics operation is discussed and measurements are compared with simulations.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.