Abstract

The construction of China Spallation Neutron Source (CSNS) was started in 2011 and will be completed in 2018. The phase I CSNS facility consists of an 80MeV H-Linac, a 1.6GeV Proton Rapid Cycling Synchrotron (RCS), two beam transport lines and a target station. Magnets in the RCS and transport lines should be measured before being installed in the tunnel. In this paper, a new hall probe measurement system is described. The design and performance of the hall probe measurement system is presented. The measurement results meet the design requirements. Some key issues were solved in the process.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.