Abstract

In the last decade considerable attention has been paid to the analysis and optimization of multi-echelon assembly networks. Research contributions in this field are mainly focussed on the determination of optimal batch quantities. In this paper two other issues concerning multi-echelon assembly networks are also discussed. The first point concerns the notion of flexibility in assembly operations. Flexibility can be achieved by spending on assembly engineering to cut set-up costs. The second point has to do with design of multi-level assembly systems. Furthermore the notion of minimum network leadtime is introduced. This turns out to be (besides minimal average cost per period) a performance indicator of considerable importance. To conclude an existing Philips product (called medsys) is presented in order to illustrate the ideas discussed in this paper.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.