Abstract
ABSTRACT The organic Rankine cycles (ORC) always operate under off-design conditions due fluctuations in renewable energy access and actual user demand. Therefore, this study considered geothermal ORC as the research object to obtain the optimal design. The off-design performance was investigated under varied load curves by selecting different design loads. First, the optimal ORC system with a constant-rate load was obtained through minimizing the specific investment cost. For this optimal system, the exergy efficiency initially increased and then decreased under off-design operation conditions. Moreover, the peak efficiency was improved by increasing the design pressure. Second, the load curves of different users were considered, including industry, business, and residents. To achieve the best operational performance of the ORC for these varied load curves, different rate loads and pressures were selected, and then the off-design performance was studied. The results demonstrate that the rate load and maximum demand load are not optimal and that the optimal load ratio (rate load divided by the highest demand load) is 60%. The operating evaporation pressure obtained through the design is 1.9 MPa. For the optimal ORC, compared with a system with a load ratio of 1.0 (rate load is equal to the highest demand load), the total investment cost decreased by approximately 30.7%, and the average exergy efficiency increased by 19.2%.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.