Abstract
In the process of designing a municipal rainwater and sewage pumping station, it is necessary to accurately grasp the design points, reasonably determine the scale of the rainwater and sewage pumping station, scientifically select the location and layout, and select materials reasonably. After completing the process design of the municipal rainwater and sewage pumping station and putting it into operation, in order to ensure the normal and stable operation of the pumping station, it is necessary to focus on strengthening the operation and management of diving equipment, cleaning equipment, and electromechanical equipment. The author analyzes the key points and specific design path of the process design of municipal rainwater and sewage pumping stations, and puts forward effective strategies for operation management, hoping to contribute to the scientific design and stable operation of municipal rainwater and sewage pumping stations.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.