Abstract

The development of the Main Treatment Plant Vienna-Simmering for 2,5 million population equivalent, which was recently put into operation, is described. The biological stage is a high rate activated sludge process at 1,2 days sludge age and 1,5 h average nominal hydraulic detention time. In a pilot Scale study, the design criteria for the biological stage were fully confirmed and indicated that the required purification efficiency (70 %) could readily be achieved (88 %) . Sludge disposal is undertaken by gravity thickening, centrifugation and incineration. A comprehensive analysis of the present operation of the process has showed that the plant has fully met expectations.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call