Abstract

A current problem of drainage reclamation is the construction of a network of drainage canals or ditches. Existing technologies of an open drainage network ensure the use of single-bucket or rotary excavators, and with a ditch depth of up to 1 m it is required to use plow-type ditchers with two or three thrust tractors of T-170B type. It is possible to implement the required pulling forces for the operation of plow canal diggers using cable-winch draught. At the same time, a tractor with a winch-anchor passes, unwinding a tracking cable, along the route of the future channel, anchors and pulls the plow canal digger with the traction of the winch. On soils with a low bearing capacity, this principle of operation allows ensuring high flotation and efficiency factor, to realize the traction forces required for constructing a canal up to 1.7 m deep in one pass. Hereof it follows that the determination of the optimal design parameters of the units for forest reclamation work, as well as their mode work is relevant.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.